Open Framing to Level 4 Finished Wall - Furring, Plumbing, Electrical, Drywall, Paint

7 months ago
38

This is the first highlights footage for the continuing remodel of our 2001 Fleetwood Mobile Home. We have finished the laundry room and have begun working on the other side of the wall between the laundry and guest bedroom. We had removed the drywall to help finish the plumbing. Now it is time to rebuild and finish off the quest bedroom. We have to deal with a mismatch, though. The plumbing box for the washer was designed for a 2x4 wall; our wall is 2x3. Oops! No worries, we can find ways to solve this. We are finishing the drywall to level 4 to match the other walls in the bedroom. And finally, apply a fresh coat of paint on every surface.