Backdrop Reinstall in Progress on Santa Fe's Raton Subdivision Model Railroad
3 months ago
127
When we first built this model railroad, we thought it would be moved to another location in a few years. To make this planned relocation easier we install the photo-realistic backdrops with Velcro.
Ultimately, the relocation to another site was abandoned and over time the Velcro has started to cause problems. The only way to correct these problems is to remove the Velcro and glue the backdrops to the wall.
This is a tedious and somewhat scary project as a lot can go wrong trying to reach across a completed model railroad and rehang the backdrops like wallpaper.
This video is a short clip to show the start of the process. Stay tuned for much more as we rehang all of the backdrops.
Loading 2 comments...
-
58:55
Santa Fe's Raton Subdivision Model Railroad
2 months agoWhy Did We Remove Our Beautiful Backdrops?
614 -
5:28
Santa Fe's Raton Subdivision Model Railroad
2 months agoFirst Train Over Raton After Backdrop Reinstall
1262 -
2:32
This N That With Matt
1 month agoGetting Ready To Remove The Tracks (Spring 2013)
471 -
4:15
CascadiaSouthernRailroad
2 months agoLayout Update 2: The First Train
8 -
25:17
TitanTrainSpotter
2 months agoAn Industrial Shortline Railroad and an Abandoned Burlington Northern Relic
25 -
28:04
OtterCreekRioGrande
1 month agoModel Railroad Update 97_ Maroon Creek 6 (A Pleasant Interruption)
16 -
28:25
OtterCreekRioGrande
2 months agoModel Railroad Update 96 Maroon Creek 5 (Almost There)
13 -
4:22
lonewolfe777
2 months agoModel Train layout update 3/27/2024
30 -
4:09
CascadiaSouthernRailroad
2 months agoUnveiling 2 New Additions to the Railroad
5 -
24:13
TitanTrainSpotter
2 months agoTrain Tunnel Action in East Dubuque and an Illinois Terminal Locomotive in Action
371